|
UGS Food Turkey's production plants for the production of agro-products produced in the entire region and provides packaging.
|
|
|
|
ILTEKNO - 2000 kWe Biogas Engine ILTEKNO - 2000 kWe Biogas Engine
|
|
Number of Employees: 51-200 TR / Istanbul (Avrupa) / Sisli
Send a Message
|
|
Oil and Gas Transmission High quality process equipment for oil and gas transmission, distribution and power generation systems
|
|
|
|
ILTEKNO - 4300 kWe Biogas Engine ILTEKNO - 4300 kWe Biogas Engine
|
|
Number of Employees: 51-200 TR / Istanbul (Avrupa) / Sisli
Send a Message
|
|
GENSET Control Panels A.D.A.M and DEIF GENSET Control Panels
|
|
|
|
Renewable Energy Renewable energy derived from natural sources and as a source of the depletion rate is faster than energy can renew itself.
|
|
|
|
ILTEKNO - 600 kWe Biogas Engine ILTEKNO - 600 kWe Biogas Engine
|
|
Number of Employees: 51-200 TR / Istanbul (Avrupa) / Sisli
Send a Message
|
|
ILTEKNO - 4500 kWe Natural Gas Engine ILTEKNO - 4500 kWe Natural Gas Engine
|
|
Number of Employees: 51-200 TR / Istanbul (Avrupa) / Sisli
Send a Message
|
|
ILTEKNO - 1560 kWe Biogas Engine ILTEKNO - 1560 kWe Biogas Engine
|
|
Number of Employees: 51-200 TR / Istanbul (Avrupa) / Sisli
Send a Message
|
|
Panel Manufacture One hundred percent of our panels are produced from local materials to take advantage of in promoting the cause of electricity sales to the state.
|
|
|
|
Power Generation Sanko Energy, while the execution of these activities, our country's energy resources; It is targeted for use in the most efficient and effective ma
|
|
|
|
ILTEKNO - 1200 kWe Biogas Engine ILTEKNO - 1200 kWe Biogas Engine
|
|
Number of Employees: 51-200 TR / Istanbul (Avrupa) / Sisli
Send a Message
|
|
Cell Cell Production Turkey's first domestic cell of our production facility has been in operation by the end of 2014.
|
|
|
|
ILTEKNO - 400 kWe Biogas Engine ILTEKNO - 400 kWe Biogas Engine
|
|
Number of Employees: 51-200 TR / Istanbul (Avrupa) / Sisli
Send a Message
|
|
1200 kWe Biogas Engine ILTEKNO - TCG 2032 Biogas Engine
|
|
Number of Employees: 51-200 TR / Istanbul (Avrupa) / Sisli
Send a Message
|
|
ILTEKNO - Natural Gas Engine ILTEKNO - Natural Gas Engine
|
|
Number of Employees: 51-200 TR / Istanbul (Avrupa) / Sisli
Send a Message
|
|
ILTEKNO - 800 kWe Biogas Engine ILTEKNO - 800 kWe Biogas Engine
|
|
Number of Employees: 51-200 TR / Istanbul (Avrupa) / Sisli
Send a Message
|
|
Completed Power Plants Completed Power Plants
|
|
|
|
Synchron Panel Synchronous Panels
|
|
|
|
Thermoelectric Waste Heat Generator
|
|
|
|
GROUND POWER UNIT It provides the energy production in the different parameters that the air vehicles require. (115/200 Volt AC 400 Hz - 28.5 Volt DC)
|
|
|
|
NETWORK. Power Distribution Panels Electric panel
|
|
|
|
Senso TowerFix This product has been specially designed to detect and fix problems with problematic wind turbines.
|
|
Number of Employees: 11-50 TR / Istanbul (Avrupa) / Bakirkoy
Send a Message
|
|
Wind Measurement Poles Wind measurement stations are shipped in packages suitable for shipments.
|
|
|
|
Hydroelectric Power Plant Project Yamaç Hydroelectric Power Plant Project / Dam and Electricity Project
|
|
|
|
Kırklareli Dam Project Kırklareli Irrigation Dam Project
|
|
|
|
Fethiye Hydroelectric Power Plant Project Fethiye Hydroelectric Dam and Electrical Project
|
|
|
|
Pınar Hydroelectric Power Plant Project Pınar Hydroelectric Power Plant Project / Dam and Energy Project
|
|
|
|
Dam Project Sirnak Dam Project
|
|
|
|
Wind Energy Potential Measurement and Analysis Wind Energy Potential Measurement and Analysis
|
|
|
|
Wind Turbines Small and Medium-sized Wind Turbines
|
|
|
|
Establishment Study of Geothermal Plants Geothermal Plants Establishment Work is carried out.
|
|
|
|
Denizli Natural Gas Power Plant Project Denizli Natural Gas Power Plant Project has 205 MW installed power, which is an AGE investment.
|
|
|
|
Ağrı Printer Dam Project Ağrı Yazıcı Dam Project is a dam built with clay core rock fill technique with a fill volume of 8,000,000 m³.
|
|
|
|
Kavsak Bendi Dam and Hydroelectric Power Plant Project Kavsak Bendi Dam and Hydroelectric Power Plant Project, Kozan is made for EnerjiSA in Adana and has a height of 73 m.
|
|
|
|
Wind Turbine Blades Wind Turbine Sash and Protection Parts
|
|
|
|
Madra Dam and Hydroelectric Power Plant Project Madra Dam and Hydroelectric Power Plant Project / Dam and Energy Project
|
|
|
|
HIGH VOLTAGE AND HIGH CURRENT, PULSE POWER TESTS HIGH VOLTAGE AND HIGH CURRENT PULSE POWER TESTS
|
|
|
|
Senso NightWatch This software runs 24/7 at Senso service providers and continuously reports the structural situation in the monitored structures.
|
|
Number of Employees: 11-50 TR / Istanbul (Avrupa) / Bakirkoy
Send a Message
|
|
High Voltage Applications - 1 kV Adjustable Pulse Generator
|
|
|
|
Power generation plants
|
|
|
|
Combined heat and power generation (LNG) Using city gas to produce electricity and hot water, eco-friendly
|
|
|
|
Electric Power Generation Electric Power Generation
|
|
|
|
200 Watt Wind Turbine Designed to be quieter, more efficient and precise to provide more energy from other wind generators
|
|
|
|
Electricity Generation © 60 MW Power Market are sold on the market within the rules. ©
|
|
|
|
VERTICAL WIND TURBINE Vertical type wind turbines are very simple to install, longlife,silent and efficient energy sources that can rotate in low winds. It has a 500W typ
|
|
Number of Employees: 51-200 TR / Istanbul (Anadolu) / Umraniye
Send a Message
|
|
Power plant Akbuk II Wind Power Plant
|
|
Number of Employees: 11-50 TR / Aydin / Didim (yenihisar)
Send a Message
|
|
Power plant Yamula Hydro Power Plant
|
|
Number of Employees: 11-50 TR / Aydin / Didim (yenihisar)
Send a Message
|
|